Client: Ministry of Communications and Transportation (SCT)
Country: Mexico

As part of the works developed in the Guadalajara (Mexico) metro line 3 project, at SENER we carried out the design of train depots and workshops, which are located in a plot measuring around 13 Ha in Tonalá.

It comprises a cluster of 10 buildings—including workshops, a stabling hall, warehouse, tracks and rail trolleys, substation, service facilities, waste management, signalling systems, security booth, and control center—that collectively support the operation, logistics, and maintenance of the metro line.

Read more

As part of the works developed in the Guadalajara (Mexico) metro line 3 project, at SENER we carried out the design of train depots and workshops, which are located in a plot measuring around 13 Ha in Tonalá.

It comprises a cluster of 10 buildings—including workshops, a stabling hall, warehouse, tracks and rail trolleys, substation, service facilities, waste management, signalling systems, security booth, and control center—that collectively support the operation, logistics, and maintenance of the metro line.

The project scope includes:

  • architectural and functional design,
  • detailed design for all disciplines,
  • site supervision,
  • implementation, coordination and management of BIM,
  • implementation of document management and change control and management.
Gross floor area of 26.728 m2
10 buildings for the operation and maintenance
A project fully developed by SENER
Read less

Related projects in Urban Transit

10.24.2025 Depots & Workshops / Panama
08.28.2025 Metro / Australia
06.24.2024 Depots & Workshops / Egypt

Contact us

Contact us to find out how we can help you.